Rashid DORJ

Rashid DORJ

Greater Ottawa Metropolitan Area
961 followers 500+ connections

About

Railway track engineer with background in design, construction, operations and…

Activity

Join now to see all activity

Experience

  • Rail Cantech Inc. Graphic
  • -

  • -

    Ottawa, Ontario, Canada

  • -

    Ottawa, Ontario, Canada

  • -

    Ottawa, Canada Area

  • -

    Ottawa, Ontario, Canada

  • -

    Ottawa, Ontario, Canada

  • -

    Ottawa, Ontario, Canada

  • -

    Montreal, Quebec, Canada

  • -

    Montreal, Quebec, Canada

  • -

    Montreal, Quebec, Canada

  • -

    Montreal, Quebec, Canada

  • -

    Montreal, Quebec, Canada

Education

Licenses & Certifications

Volunteer Experience

  • Civilian Instructor

    Royal Canadian Army Cadets (2806 Pointe-Claire Cadet Corps)

    - 2 years 10 months

    Children

  • Volunteer sitter (Patients with dementia)

    Sainte-Anne Veterans Hospital

    - 4 months

    Health

Courses

  • AREMA - Practical Track Measurements: Tools & Techniques

    -

  • University of Wisconsin-Madison - Rail Freight Yards, Terminals & Intermodal Facilities

    -

  • Wheel Rail Seminars - Wheel / Rail Interaction Principles Course

    -

Projects

  • Ottawa Light Rail Transit - Confederation Line Phase 2

    - Present

  • Ottawa Light Rail Transit - Trillium Line Extension

    - Present

  • COMILOG-ERAMET (Gabonese Republic)

    Optimization of the preset alignment and design criteria for connecting the new Maboumine mine site to the Transgabonais railway line.

  • Compagnie des Bauxites de Guinée (Republic of Guinea)

    As part of the Technical Assistance contract with the Compagnie des Bauxites de Guinée (CBG), the mandate was to perform a study for the capacity of the “Chemin de fer de Boké”.

  • Rio Tinto Alcan's KABATA Alumina Refinery (Republic of Guinea)

    Traffic study, conceptual alignment and track structure design for the existing railroad line between the city of Kamsar and the KABATA refinery.

    Other creators
  • Silver Yard Phase 1 (Labrador Iron Mines Holdings Limited)

    - Present

    Design and construction supervision of Labrador Iron Mines existing Silver Yard.

  • Houston Yard (Labrador Iron Mines Holdings Limited)

    - Present

    Design and construction supervision for the future Houston Yard.

  • O-Train Confederation Line Track Absorption Materials

    -

  • O-Train Confederation Line Rail Dampers

    -

  • O-Train Line 2 Tie Replacement 2019

    -

    Three part project:
    1) Replacement of 1000 timber ties (rolled plates and spike plates);
    2) Preventative component replacement / upgrades to a 56 degree Progress Rail diamond shared with VIARAIL;
    3) Preventative component replacement / upgrades to a 86 degree Canadian Pacific diamond shared with CN.

    Other creators
  • O-Train Line 2 Brookfield South Vibration Mitigation

    -

    Other creators
  • O-Train Line 2 Dow’s Lake Tunnel Cluster Tie Replacement 2019

    -

  • O-Train Line 2 Turnout Roller Installation

    -

    Retrofit installation of different style turnout rollers (Ekoslide Type C & Schwihag) on eight mainline turnouts (One #11 Progress Rail, two #11 voestalpine Nortrak, one #13 Canadian Pacific, and four #15 Progress Rail).

  • O-Train Line 2 Preventative Rail Grinding

    -

    Three part project:
    1) Mill scale removal;
    2) Rail corrugation removal;
    3) Rail profiling (2 tangent profiles and 3 curve profiles).

  • O-Train Trillium Line Railway Timber Tie Replacement 2017

    -

    Preventative replacement of 1,600 ACZA timber ties.

    Other creators
  • O-Train Trillium Line Special Trackwork Rehabilitation

    -

  • O-Train Trillium Line Dow's Lake Tunnel Track Rehabilitation 2017

    -

    Other creators
  • O-Train Trillium Line Carleton Siding

    -

  • O-Train Trillium Line Walkley Interlocking South Connecting Track

    -

  • O-Train Trillium Line Railway Timber Tie Supply 2017

    -

  • O-Train Trillium Line Ellwood Diamond Crossing Track Survey

    -

    Other creators
  • Rail Profile / Geometry Inspection 2017

    -

    Other creators
  • Ottawa Light Rail Transit - Confederation Line Phase 1

    -

  • Silver Yard Phase 2 (Labrador Iron Mines Holdings Limited)

    -

    Complete railway / civil design and construction for the expansion of Phase 2 project meant to accommodate two complete 164 iron ore car trains.

  • KeRail (Tata Steel Canada Limited)

    -

    An EPCM contract involving all railway / civil design and construction of a new 21km railway link between Labrador Iron Mine’s Silver Yard and Tata Steel Mineral Canada’s Timmins mine.

    Other creators
  • Port of Montréal (Montréal Port Authority)

    -

    The inspection of 80 km of yard track with the use of a Ground-Penetrating Radar as well as a standard visual inspection method.

    Other creators
  • Port of Montréal (Montréal Port Authority)

    -

    Design and delivery of an automated Ground Penetrating Radar equipment to be used for the inspection of the ballast, sub-ballast and sub-grade layers.

  • Bois-de-Boulogne Train Station (Agence métropolitain de transport)

    -

    Study and analysis of an interconnecting system to relate two station platforms.

  • Jubail Industrial Rail FEED

    -

    The 30% FEED design for the development of the railway infrastructures meant to service the industries within the Jubail Industrial City zone.

  • Mary River Project (Baffinland Iron Mine Corporation)

    -

    Design of a mining railway to be built in the extreme arctic environment.

  • Jonction de l’est (Agence métropolitain de transport)

    -

    Design of the catenary system, including the supports, wiring and catenary reinforcement.

    Other creators
  • Tie survey & Mani culvert (Compagnie de chemin de fer de l’Outaouais)

    -

    Design for the rehabilitation of the Mani culvert, as well as the supervision for the replacement of ties along the 20 miles of track operated by the HCW steam train.

    Other creators
  • Rideau River Bridge (OC Transpo)

    -

    Design for the rehabilitation of the Rideau River railway bridge.

Languages

  • English

    Full professional proficiency

  • French

    Full professional proficiency

  • Persian

    Native or bilingual proficiency

Organizations

  • Professional Engineers Ontario

    -

    - Present

More activity by Rashid

View Rashid’s full profile

  • See who you know in common
  • Get introduced
  • Contact Rashid directly
Join to view full profile

Other similar profiles

Explore collaborative articles

We’re unlocking community knowledge in a new way. Experts add insights directly into each article, started with the help of AI.

Explore More

Add new skills with these courses