About
Railway track engineer with background in design, construction, operations and…
Activity
-
Nous sommes fiers partenaires de la Charte de collaboration pour le développement de contenu universitaire en génie de la mobilité ferroviaire…
Nous sommes fiers partenaires de la Charte de collaboration pour le développement de contenu universitaire en génie de la mobilité ferroviaire…
Liked by Rashid DORJ
-
🚆 Honoured to Serve as Interim General Manager for OC Transpo 🚍 I am truly honoured to start in the role of Interim General Manager for OC…
🚆 Honoured to Serve as Interim General Manager for OC Transpo 🚍 I am truly honoured to start in the role of Interim General Manager for OC…
Liked by Rashid DORJ
-
For another year, OC Transpo has had great success getting customers to and from Canada Day and Bluesfest! We are always proud to support our city’s…
For another year, OC Transpo has had great success getting customers to and from Canada Day and Bluesfest! We are always proud to support our city’s…
Liked by Rashid DORJ
Experience
Education
Licenses & Certifications
Volunteer Experience
-
Civilian Instructor
Royal Canadian Army Cadets (2806 Pointe-Claire Cadet Corps)
- 2 years 10 months
Children
-
Volunteer sitter (Patients with dementia)
Sainte-Anne Veterans Hospital
- 4 months
Health
Courses
-
AREMA - Practical Track Measurements: Tools & Techniques
-
-
University of Wisconsin-Madison - Rail Freight Yards, Terminals & Intermodal Facilities
-
-
Wheel Rail Seminars - Wheel / Rail Interaction Principles Course
-
Projects
-
Ottawa Light Rail Transit - Confederation Line Phase 2
- Present
-
Ottawa Light Rail Transit - Trillium Line Extension
- Present
-
COMILOG-ERAMET (Gabonese Republic)
Optimization of the preset alignment and design criteria for connecting the new Maboumine mine site to the Transgabonais railway line.
-
Compagnie des Bauxites de Guinée (Republic of Guinea)
As part of the Technical Assistance contract with the Compagnie des Bauxites de Guinée (CBG), the mandate was to perform a study for the capacity of the “Chemin de fer de Boké”.
-
Silver Yard Phase 1 (Labrador Iron Mines Holdings Limited)
- Present
Design and construction supervision of Labrador Iron Mines existing Silver Yard.
-
Houston Yard (Labrador Iron Mines Holdings Limited)
- Present
Design and construction supervision for the future Houston Yard.
-
O-Train Confederation Line Track Absorption Materials
-
-
O-Train Confederation Line Rail Dampers
-
-
O-Train Line 2 Tie Replacement 2019
-
Three part project:
1) Replacement of 1000 timber ties (rolled plates and spike plates);
2) Preventative component replacement / upgrades to a 56 degree Progress Rail diamond shared with VIARAIL;
3) Preventative component replacement / upgrades to a 86 degree Canadian Pacific diamond shared with CN.Other creators -
O-Train Line 2 Dow’s Lake Tunnel Cluster Tie Replacement 2019
-
-
O-Train Line 2 Turnout Roller Installation
-
Retrofit installation of different style turnout rollers (Ekoslide Type C & Schwihag) on eight mainline turnouts (One #11 Progress Rail, two #11 voestalpine Nortrak, one #13 Canadian Pacific, and four #15 Progress Rail).
-
O-Train Line 2 Preventative Rail Grinding
-
Three part project:
1) Mill scale removal;
2) Rail corrugation removal;
3) Rail profiling (2 tangent profiles and 3 curve profiles). -
O-Train Trillium Line Special Trackwork Rehabilitation
-
-
O-Train Trillium Line Carleton Siding
-
-
O-Train Trillium Line Walkley Interlocking South Connecting Track
-
-
O-Train Trillium Line Railway Timber Tie Supply 2017
-
-
Silver Yard Phase 2 (Labrador Iron Mines Holdings Limited)
-
Complete railway / civil design and construction for the expansion of Phase 2 project meant to accommodate two complete 164 iron ore car trains.
-
Port of Montréal (Montréal Port Authority)
-
Design and delivery of an automated Ground Penetrating Radar equipment to be used for the inspection of the ballast, sub-ballast and sub-grade layers.
-
Bois-de-Boulogne Train Station (Agence métropolitain de transport)
-
Study and analysis of an interconnecting system to relate two station platforms.
-
Jubail Industrial Rail FEED
-
The 30% FEED design for the development of the railway infrastructures meant to service the industries within the Jubail Industrial City zone.
-
Mary River Project (Baffinland Iron Mine Corporation)
-
Design of a mining railway to be built in the extreme arctic environment.
-
Rideau River Bridge (OC Transpo)
-
Design for the rehabilitation of the Rideau River railway bridge.
Languages
-
English
Full professional proficiency
-
French
Full professional proficiency
-
Persian
Native or bilingual proficiency
Organizations
-
Professional Engineers Ontario
-
- Present
More activity by Rashid
-
😁 Thank you! It takes a village. Thank you to everyone, including WGD Consulting Inc. for supporting the work and promoting our industry. Looking…
😁 Thank you! It takes a village. Thank you to everyone, including WGD Consulting Inc. for supporting the work and promoting our industry. Looking…
Liked by Rashid DORJ
-
Rail Cantech has kept me real busy for years. But above the trials and tribulations of professional life, I tried something new and worked on a…
Rail Cantech has kept me real busy for years. But above the trials and tribulations of professional life, I tried something new and worked on a…
Liked by Rashid DORJ
-
Ma sœur est à la recherche d'une personne pour son équipe dans l'industrie pharmaceutique.
Ma sœur est à la recherche d'une personne pour son équipe dans l'industrie pharmaceutique.
Liked by Rashid DORJ
-
📣Excited to join Kablamo as Managing Director, Canada! After 20+ years delivering transformational value by tackling my clients' biggest challenges…
📣Excited to join Kablamo as Managing Director, Canada! After 20+ years delivering transformational value by tackling my clients' biggest challenges…
Liked by Rashid DORJ
-
While at the 2025 APTA Rail Conference in San Francisco I caught up with a good friend, Hans Cruse who has recently jointed the Stadler team in the…
While at the 2025 APTA Rail Conference in San Francisco I caught up with a good friend, Hans Cruse who has recently jointed the Stadler team in the…
Liked by Rashid DORJ
-
An incredible chapter in my career comes to an end and the time has come for me to say goodbye to Rail Cantech. Working with Rail Cantech over the…
An incredible chapter in my career comes to an end and the time has come for me to say goodbye to Rail Cantech. Working with Rail Cantech over the…
Liked by Rashid DORJ
-
Réservé la date : 18 novembre 2025 (Montréal) AQTr Colloque Ferroviaire 2025 Colloque ferroviaire 2025 | AQTr - Association québécoise des…
Réservé la date : 18 novembre 2025 (Montréal) AQTr Colloque Ferroviaire 2025 Colloque ferroviaire 2025 | AQTr - Association québécoise des…
Liked by Rashid DORJ
Other similar profiles
Explore collaborative articles
We’re unlocking community knowledge in a new way. Experts add insights directly into each article, started with the help of AI.
Explore More